SUC Project
Important Hints on the SUC Project
Largest single project being undertaken in the Kurdistan Region.
- Design and Build of University Campus.
- $260 Million original contract value.
- 2 Million m2 overall ground area.
- 6 Years Construction Period.
- 42 Buildings with total floor area of 350,000 m2
- To accommodate 20,000 students.
- Includes 12 km of Circulation Roads and Walkways.
- All Utilities Including Water Treatment, Wastewater Treatment, Power Generation & Distribution, Drainage system and Sewerage system.
Landscaping works.
- Temporary Accommodation and Catering Facilities for up to 1,200 construction personnel.
- Medical Clinic on site, with full time doctor and nurses.
- Maintenance Workshop, Warehousing and Open Storage.
- US$ 4 Million in Equipment & Assets.
- 58 items of construction Plant, Equipment and Machinery.
- 30 Vehicles.
|